Adam Smith of Phoenix Construction smooths a joint between newly poured concrete sidewalk sections outside Hill Plaza at 3301 50th Ave. Friday. Plans for the strip mall’s renovations also include new decorative stone and powder-coated steel features. Businesses located there remain open throughout the renovations.
Adam Smith of Phoenix Construction smooths a joint between newly poured concrete sidewalk sections outside Hill Plaza at 3301 50th Ave. Friday. Plans for the strip mall’s renovations also include new decorative stone and powder-coated steel features. Businesses located there remain open throughout the renovations.