Pembina plans new pipeline, third fractionator at Redwater

CALGARY — Pembina Pipeline Corp. (TSX:PPL) is proceeding with construction on a new 55,000 barrel per day propane-plus fractionator at its existing Redwater fractionation and storage complex along with an associated pipeline at an estimated cost of $460 million.

CALGARY — Pembina Pipeline Corp. (TSX:PPL) is proceeding with construction on a new 55,000 barrel per day propane-plus fractionator at its existing Redwater fractionation and storage complex along with an associated pipeline at an estimated cost of $460 million.

RFS III, which is underpinned by long-term take-or-pay contracts with multiple producers, will be the third fractionator at Pembina’s Redwater complex and will leverage the design and engineering work completed for Pembina’s first and second fractionators — facilities that process mixed natural gas liquids into their constituent parts such as ethane, propane and butane.

The estimated cost of the fractionator, including associated caverns and previously announced pre-build expenses, is $400 million.

“We are excited to have secured the commercial agreements to proceed with building a third fractionator,” Stuart Taylor, senior vice-president for NGL and natural gas facilities, said in a statement announcing the project.

“RFS III will provide our customers with timely fractionation capacity along with efficient storage and market access through our well-established facilities at Redwater. Leveraging our existing assets and using similar plant designs again demonstrates the value of our integrated strategy.”

In conjunction with building RFS III, Pembina also plans to construct a new high vapour pressure pipeline lateral into the Willesden Green area in south-central Alberta at an estimated cost of $60 million.

The project involves installing some 56 kilometres of new HVP pipeline along with other associated infrastructure that will be connected to Pembina’s Brazeau Pipeline. It will be capable of transporting ethane-plus natural gas liquids from the field for delivery into the Fort Saskatchewan area.

Subject to regulatory and environmental approval, Pembina expects the new pipeline to be in service in mid-2015.

Calgary-based Pembina Pipeline operates pipelines that transport conventional and synthetic crude oil, heavy oil and oilsands products, condensate and natural gas liquids produced in Western Canada.

It also owns and operates gas gathering and processing facilities and an oil and natural gas liquids infrastructure and logistics business and offers a full spectrum of midstream and marketing services.

Just Posted

WATCH: Red Deer teacher engages students with “cool” science experiments

On Thursday, he made fire dance to the beat of the music

Province purchases land for new Red Deer courthouse

Construction to begin in the fall of 2019

Parking costs in Red Deer are going up — so are parking tickets

City council raises parking rates by 25 per cent starting July 1

WATCH: Alberta Party leadership candidates in Red Deer

Three people vying to be the leader of the Alberta Party were… Continue reading

In photos: Get ready for Western Canadian Championships

Haywood NorAm Western Canadian Championships and Peavey Mart Alberta Cup 5/6 start… Continue reading

WATCH: Red Deer city council debates cost-savings versus quality of life

Majority of councillors decide certain services are worth preserving

Got milk? Highway reopened near Millet

A southbound truck hauling milk and cartons collided with a bridge

Stettler’s newest residents overcame fear, bloodshed to come here

Daniel Kwizera, Diane Mukasine and kids now permanent residents

Giddy up: Red Deer to host Canadian Finals Rodeo in 2018

The CFR is expected to bring $20-30 million annually to Red Deer and region

Ice dancers Virtue and Moir to carry flag at Pyeongchang Olympics

Not since Kurt Browning at the 1994 Lillehammer Games has a figure… Continue reading

Beer Canada calls on feds to axe increasing beer tax as consumption trends down

OTTAWA — A trade association for Canada’s beer industry wants the federal… Continue reading

Most Read


Five-day delivery plus unlimited digital access for $185 for 260 issues (must live in delivery area to qualify) Unlimited Digital Access 99 cents for the first four weeks and then only $15 per month Five-day delivery plus unlimited digital access for $15 a month