Pembina plans new pipeline, third fractionator at Redwater

CALGARY — Pembina Pipeline Corp. (TSX:PPL) is proceeding with construction on a new 55,000 barrel per day propane-plus fractionator at its existing Redwater fractionation and storage complex along with an associated pipeline at an estimated cost of $460 million.

CALGARY — Pembina Pipeline Corp. (TSX:PPL) is proceeding with construction on a new 55,000 barrel per day propane-plus fractionator at its existing Redwater fractionation and storage complex along with an associated pipeline at an estimated cost of $460 million.

RFS III, which is underpinned by long-term take-or-pay contracts with multiple producers, will be the third fractionator at Pembina’s Redwater complex and will leverage the design and engineering work completed for Pembina’s first and second fractionators — facilities that process mixed natural gas liquids into their constituent parts such as ethane, propane and butane.

The estimated cost of the fractionator, including associated caverns and previously announced pre-build expenses, is $400 million.

“We are excited to have secured the commercial agreements to proceed with building a third fractionator,” Stuart Taylor, senior vice-president for NGL and natural gas facilities, said in a statement announcing the project.

“RFS III will provide our customers with timely fractionation capacity along with efficient storage and market access through our well-established facilities at Redwater. Leveraging our existing assets and using similar plant designs again demonstrates the value of our integrated strategy.”

In conjunction with building RFS III, Pembina also plans to construct a new high vapour pressure pipeline lateral into the Willesden Green area in south-central Alberta at an estimated cost of $60 million.

The project involves installing some 56 kilometres of new HVP pipeline along with other associated infrastructure that will be connected to Pembina’s Brazeau Pipeline. It will be capable of transporting ethane-plus natural gas liquids from the field for delivery into the Fort Saskatchewan area.

Subject to regulatory and environmental approval, Pembina expects the new pipeline to be in service in mid-2015.

Calgary-based Pembina Pipeline operates pipelines that transport conventional and synthetic crude oil, heavy oil and oilsands products, condensate and natural gas liquids produced in Western Canada.

It also owns and operates gas gathering and processing facilities and an oil and natural gas liquids infrastructure and logistics business and offers a full spectrum of midstream and marketing services.

Just Posted

Big-time entertainers to perform in Red Deer during the 2019 Canada Winter Games

Musicans announced include Walk Off the Earth, k-os, Brett Kissel

Builders say it’s not the time for higher permit fees in Red Deer

Construction industry is hard hit by slow economy

Bighorn Country telephone town hall for Red Deer area set for Wednesday

Residents can phone in from 6:30-7:30 p.m. to hear about the project or ask questions

YouTube revises policy, bans dangerous prank videos

SAN BRUNO, Calif. — YouTube is trying to prevent otherwise bright people… Continue reading

May’s govt faces no-confidence vote after huge Brexit defeat

LONDON — British Prime Minister Theresa May faced a no-confidence vote Wednesday,… Continue reading

WATCH:2019 Canada Winter Games torchbearers announced

Sixteen torchbearers announced with others to be revealed during Opening Ceremonies

Alberta doctor accused of sexual assault asked to voluntarily give up practice

College says Dr. Barry Wollach should discontinue his practice, given the seriousness of the allegation against him

Speedy acceptance of Saudi shows refugee system’s flaws

Who would not wish Rahaf Mohammed well? The 18-year-old Saudi wants to… Continue reading

Hertl’s hat trick leads Sharks past Penguins 5-2

SAN JOSE, Calif. — Tomas Hertl needed just three games to get… Continue reading

Starring role beckons for Canada’s Alphonso Davies at Bayern Munich

BERLIN — Canadian teenager Alphonso Davies could be thrown in at the… Continue reading

Bus singer gives voice to Venezuela’s growing diaspora

LIMA, Peru — A year ago, Venezuelan migrant Reymar Perdomo was singing… Continue reading

Corey Hart to be inducted into Canadian Music Hall of Fame at Juno Awards

TORONTO — Crooner Corey Hart will join Canadian music royalty in the… Continue reading

Lucic, Kassian each score twice to power Oilers in 7-2 win over Sabres

EDMONTON — Milan Lucic and Zack Kassian each scored a pair of… Continue reading

Big Valley family gives back to community

Donates $24,560 to Stettler Health Foundation and Edmonton Stollery Children’s Hospital

Most Read