Skip to content

Wasteful spending of our tax dollars

When does the bleeding stop?

When does the bleeding stop?

First we have the fiasco of the bike lanes. I would like to know the total cost of installation and then the removal of some of the bike lanes.

Now we have removing perfectly good cement sidewalks and replacing them with asphalt.

On July 11, we had a crew at Three Mile Bend pumping water out of the waterways within the park.

The river is down three metres from flood level, the park is built on a gravel base folks — duh! — it will recede on its own.

I can understand incompetents coming up with these ideas.

However, I just cannot understand another group of incompetents approving the ideas.

What’s with that?

Am I from another planet or what?

I hope the people of Red Deer remember some of this total waste of our hard-earned tax dollars when the next election comes around.

Larry Brown

Red Deer