Skip to content

Working in a haze

A City of Red Deer public works crew has been working on both sides of Taylor Bridge preparing it for the engineers who will be doing a comprehensive inspection. Alex McCormick has to clean out every nook and cranny above and below so that all potential flaws will be visible to the inspectors.
Working in a Haze 110816jer
Array

A City of Red Deer public works crew has been working on both sides of Taylor Bridge preparing it for the engineers who will be doing a comprehensive inspection. Alex McCormick has to clean out every nook and cranny above and below so that all potential flaws will be visible to the inspectors.